TM 9-6115-668-13
1.
Place engine preheating control board in control cabinet (3) and install four new self-locking nuts
(55) on bolts (56).
2.
Noting correct labeling and position, install cables on terminal strip X101 (54).
Tighten nut on threaded pin with torque wrench to torque values in
table (item G.2, appendix G).
3.
4.
5.
6.
7.
8.
Install washer (16), grounding strap (15), washer (14), serrated lock washer (13) and new nut (12)
on threaded pin (17). Torque nut (12)
Close cable conduit next to terminal strip X101 (54).
Install cover (11) using two screws (9) and two washers (10).
Install two washers (6), two serrated lock washers (7) and tighten two nuts (8).
Stow prop (5) and close front panel (4).
Close flap (2).
Use new self-locking nuts when installing the engine preheating con-
trol board.
4 - 1 6 6