TM 9-6115-668-13SHORT OPERATING INSTRUCTIONSEG 150KW / EPP 2 x 150KW / 400Hz,120/208VNSN:Preparation1.Check all cable connections between EPP and power distribution unit (PDU).2.Connect EPP to ground.3.Connect potential equalization cables to PDU and to the load.4.Connect exhaust hoses.5.Perform a visual check of the engine and generator.6.Check oil level and top up to maximum if required.7.Turn MASTER SWITCH to ON.8.Perform lamp test.9.Check fuel level and top up if necessary.10. Check gauges and meters.11.Uncoil and connect power supply and control cables.Starting the generatorAmbient temperature >0 ° CTurn GLOWPLUGSTART switch to the far right position, and hold (max. 30seconds) untilengine is running.Ambient temperature between 0 ° C and -30 ° CTurn GLOWPLUGSTART switch to center position and hold until GLOWPLUG ON lamp lights up(approx. 90 sec.); then turn GLOWPLUGSTART switch to extremeright position until engine is running.Function CheckAfter starting the unit1.All fault indicators must be OFF.2.Hourmeter is ON.3.Oil pressure indication must be within the range of 3 - 5 bar.30 sec. after the unit is running1.Check the frequency indication (400 Hz).2.Check output voltage by using the voltage selector switch.L1 -N; L2-N; L3-N = 120 VL1 42; L2-L3; L3-L1 = 208 VFigure 2-17 Generator Set 150 kW Short Operating Instructions Plate (sheet 1 of 2).2 - 51
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business