TM 9-6115-662-13&P
TEST
1. Set multimeter for resistance.
2. Refer to FO-1 and check continuity of each electrical lead from P2.
NOTE
Pins Gl, G2, G3, and G4 are common points and should read continuity to
the green wire. Ensure that Gl, G2, G3, and G4 are common points and
read continuity to each other.
Table 4-2. Cable Assembly W19.
Wire Color
From
To
Black
P2-A
L1
Red
P2-B
L2
Blue
P2-C
L3
White
P2-N
LO
Green
P2-G1
GND
Green
P2-G2
GND
Green
P2-G3
GND
I
Green
I
P2-G4
I
GND
INSTALLATION
1. Connect new W19 to J2 of the switch box on unit A.
2. Connect the four leads of the power cable to the generator set on unit B.
4-18