Home
Download PDF
Order CD-ROM
Order in Print
Figure G-5. Cable Assembly W1 and W2 (Sheet 2).
Figure G-7. Switch Box Gasket.
TM-9-6115-660-13P Power Plant Diesel Engine Driven 1-Ton Trailer Mounted (With Racks) 3Kw 60 Hz AN/MJQ-42 Manual
Page Navigation
290
291
292
293
294
295
296
297
298
299
300
TM 9-6115-660-13&P
NOTES:
1.
2.
3.
Remove old deck covering and clean area.
Cut deck covering material (1) to desired length.
Remove protective cover from pressure-sensitive adhesive backing and apply to area to be
Figure G-6. Deck Covering.
G-13