TM 9-6115-604-34NAVFAC P-8-633-342-17. LOAD CIRCUIT BREAKER CB1O1 REMOVAL AND INSTALLATION. Special tools are required to accomplishload circuit breaker CB101 removal or installation. These tools (crank or ramps) are supplied with the generator set. SeeFigure 2-15 for their locations.NOTELoad circuit breaker CB101 removal or installation will require two or more persons.a.Remove. This procedure requires use of a forklift with tongs a minimum 42 inches (1067 mm) in length, 4 inches(107 mm) in width, and 1.50 inches (38 mm) thick.(1)Remove the ramps from the generator compartment as follows:(a) Open access doors as required.(b) See Figure 2-15, detail A, and remove screws, lockwashers, and channels to remove ramps.(2)See Figure 2-15, details B and C. Open control room door and cabinet B bottom compartment. Removelip flange at base of cabinet B by removing screws, bevel washers and nuts to gain access to rampalignment pins.(3)Hook the end of each ramp removed in step (1), above, on alignment pins at base of cabinet B. Note thatthe ramps when installed will be lying on the floor angled slightly towards the left side of the control roomdoor.(4)Remove racking handle from storage at left side of load circuit breaker CB1 01 and attach to racking crankon circuit breaker panel. With racking handle, turn racking crank counterclockwise until load circuit breakerCB1 01 moves as far outwards as it will go. Then remove racking handle and restore to storage position atleft of circuit breaker compartment.(5)See Figure 2-15, detail B. Locate Kirk-key interlock at lower right side of circuit breaker compartment.Turn the load circuit breaker Kirk-key interlock and remove key.(6)See Figure 2-15, detail C. With Kirk-key interlock key removed in step (5), above, unlock the maindisconnect switch S120 Kirk-key interlock. Pull main disconnect switch S120 handle downwards to OPENposition.(7)Adjust forklift tongs until they are approximately 8 inches (203 mm) apart at the center. Maneuver forkliftuntil tongs are halfway inside the control room, in between and parallel with the load circuit breaker rampchannels. Adjust forklift tongs until they are flush against the control room floor and centered between thetwo ramp channels. Position piece of plywood or similar buffer material on forklift tongs to preventdamage to load circuit breaker CB1 01 underside when lifting.(8)Locate release latch at bottom right side of load circuit breaker CB101. Pull latch upwards and slightly liftcircuit breaker front and pull out of cabinet until front circuit breaker rollers are engaged on the rampchannels. Roll load circuit breaker CB101 out of cabinet and onto ramps. Slightly lift rear end to allow rearcircuit breaker rollers to engage the ramp channels. Two persons are required to roll the load circuitbreaker CB101 assembly out of the cabinet (9) Roll load circuit breaker CB101 on ramp channels intoposition above forklift tongs. Maneuver forklift, if needed, to ensure load circuit breaker CB101 undersideis fully supported. Slightly lift load circuit breaker CB011 and secure to the forklift tongs.CAUTIONDo not tilt forklift tongs backwards when removing load circuit breaker CB101 as this maycause damage.(10)Carefully remove load circuit breaker CB1 01 from the generator set.2-45
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business