TM 9-6115-604-34NAVFAC P-8-633-344-7. BATTERY CHARGER BC1 ASSEMBLY.Components that were removed by unsoldering may be replaced bysoldering.a.Install the silicone diodes (38, Figure 4-2) on the heatsink (37), and install the heatsink on the enclosure rearpanel (7) with the capscrews (36).b.Install the transistor (35) on the terminal board (31) with the round head screw (34). Install the zener resistor (33)on the terminal board (31) with the screw and captive washer assemblies (32). Install the diode (43) and thezener diode (47) on the terminal board. Install the terminal board (31) on the enclosure rear panel (7) with thecapscrews (30).c.Install the bracket (20) on the enclosure rear panel (7) with the hexagon head screw (17).d.Install the fixed capacitor (22). Install the cut out relay (21) on the bracket (20) with the hexagonal nut (19) andlockwasher (1 8).e.Install the reactor assembly (29) on the enclosure rear panel (7) with the hexagon head screws (25), hexagonalnuts (26), lockwashers (27), and flat washers (28).f.Install the transformer (24) on the enclosure rear panel (7) with the hexagon head screws (23).g.Install the fuse holders (45 and 46). Install the input and output fuses (16 and 15) on the fuse board (14). Installthe fuse board on transformer (24) with the screw (13).h.Install the resistor (9) on the enclosure (6) with the hexagon head screws (12). A new resistor (9) must beadjusted as follows:(1)Adjust the float voltage to 5 V dc with the red slider band on the resistor (9). Move the red slider bandtoward the green slider band to raise the taper and shutdown point, and move the red slider band awayfrom the green slider band to lower the taper and shutdown point. Taper and shutdown point should be 23V dc.(2)Adjust the equalizer voltage with the green slider band on the resistor (9). The equalizer voltage may beadjusted in the same manner as the float voltage.i.Install the retaining clip (44). Install the resistor (8) on the enclosure (6) with the hexagon head screws (11) andflat washers (10).j.Install the enclosure (6) on the enclosure rear panel (7) with the hexagon head screws (4) and lockwashers (5).k.Install the nameplate (2) with rivets (1), and install the front cover (3) on the enclosure (6), if removed.l.Install wiring as tagged. Discard tags.4-8. INSTALLATION OF BATTERY CHARGER BC1.Install the battery charger BC 1 in accordance with paragraph 4-20 of the Operator and Organizational Maintenance Manual.4-9. TESTING OF BATTERY CHARGER BC1.Test battery charger BC 1 in accordance with paragraph 4-20 of theOperator and Organizational Maintenance Manual.SECTION Ill. STARTER MOTOR B1 AND B2 REPAIR4-10. GENERAL. Both starter motors B1 and B2 used on the engine are identical 24 V dc units, and have positive-engagement drive pinions. Current, supplied to the S terminal on the solenoid switch activates a plunger. The plungerperforms two functions: it moves the shift lever to engage the pinion with the flywheel ring gear teeth, and closes a switchto supply current to the field coils after the pinion and ring gear teeth have meshed. (The switch will not close on buttcontact of the pinion and ring gear teeth; the teeth must be meshed.) After the engine is started, an overrunning clutch inthe pinion protects the starter motors B1 and B2 from overspeed, and allows the return spring to disengage the pinionwhen the starting current is cut off.4-6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business