ARMY TM 9-6115-604-12NAVY NAVFAC P-8-633-12(h)Measure dc voltage across pins A and B of GOVERNOR CONTROL receptacles J18, J19, or J20 (see Figure 2-18). Voltage should be 5.4 to 5 6 V dc If not, proceed as follows:1Open upper cabinet B door.2See Figure 2-6 Adjust LOAD SHARING SENSITIVITY (5) on the load sharing module to obtain areading of 5.4 to 5.6 V dc across PARALLEL LINES terminals 10 and 11. These are on the terminal board across the bottom of the load sharing module3Close upper cabinet B door.(I)Set BREAKER CONTROL switch S4 (20, Figure 2-2) to TRIP(12)Operate generator set until engine thermostats open and normal coolant temperatures can be obtained. Add additional coolant If necessary(13)Allow generator set to operate at least 5 minutes at no load. Then shut down generator set in accordance with Figure 2-20I.FinalNotes.(1)Leave generator set connected to utility power at all times, if possible. If not possible, set UTILITYPOWER circuit breaker CB125 (5, Figure 2-11) to OFF, operate circuit breaker locking beam (3), and set SET POWERcircuit breaker CB124 (4) to ON.(2)Leave EMERGENCY LIGHTING switch CB CB2 (17, Figure 2-1) on at all times Emergency lights willautomatically shut off in presence of set or utility power.(3) Leave generator heaters and engine coolant and oil heaters on at all times The heaters will automaticallyshut off when the generator set is running.SECTION II. MOVEMENT TO A NEW WORK SITE4-3. DISMANTLING FOR MOVEMENT. Shut down generator set in accordance with Figure 2-15 (single set) or Figure2-20 (parallel), then proceed as followsa.LoadCircuitBreakerCB101andMainDisconnectSwitchS120. The generator set Is shipped with maindisconnect switch S120 locked in CLOSED position and the kirk-key interlock key Installed on load circuit breakerCB101. For shipment purposes, load circuit breaker C8101 Is held In place using integral shipping braces that areinstalled as follows ;(1)Open lower cabinet B door (Figure 4-6) Remove shipping screws (2) Installed on threaded mounts on bothsides of the circuit breaker frame(2)Loosen mounting screws holding shipping braces (1) Rotate shipping braces 90 degrees upwards andtowards center of compartment(3)With racking handle (7), turn racking crank (3) counterclockwise until load circuit breaker CB101 (8) frameis flush against shipping braces (1). Position braces (1) so that mounting holes on load circuit breaker CB101 (8) frameand braces are exactly aligned. Then tighten screws holding braces against cabinet frame.(4)Install shipping screws (2) removed from threaded mounts on braces (1) against load circuit breakerCB101 (8) frame and tighten.b.DisconnectionofCablesHarnessesandHosesNever remove power cables by hand unless generator set Is off andpower cables are not connected to a live voltage source. Never touch ahigh-voltage lead or terminal until it has been discharged to ground.Failure to observe this warning may result in death by electrocution.4-18
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business