ARMY TM 9-6115-464-12AIR FORCE TO 35C2-3-445-1NAVY NAVFAC P-8-624-122-10 PARALLELOPERATION(LOADSHARING].a.b.c.d.e.f.g.h.i.2-14The first set started shall be designated as “on-line” and the sets in parallel operation shall be designated“on coming”. With all sets shut down install the paralleling cable and connect the load terminal boardsas described in paragraph 2-4e. Check that the voltage reconnection boards (paragraph 2-5) of the setsare identically positioned.Do not place the circuit breaker switch on any of the generator sets in theCLOSE position until specifically directed to do so. Closing the circuitbreaker switch at any other time may severely damage one or more of thegenerator sets. Equipment damage could result if caution is not observed.Check that the main power switch (Figure 2-6) at the load is open beforeattempting to place a generator set on line. Equipment damage could resultif caution is not observed.Start the generator sets as described in paragraph 2-6. Do not perform steps 7 & 8 of Figure 2-8.Hold the CKT BRK switch (30, Figure 2-1) of the “on- line” set in the CLOSE position until the CKT BRKindicator light (31 ) illuminates. Place the operation switch (26) in the PARALLEL position.Adjust the voltage on both sets to the required value. Adjust the frequency of the “on-line” set to the re-quired value. Place the operation switch (26) of the “on-coming” set in the PARALLEL position.NOTEObserve the synchronizing lights of the “on-coming” set. The lights should go onand off simultaneously. If the lights go on and off alternately, sets are out of phase.Stop both sets and correct interconnect cables (Figure 2-5). If the problem per-sists, refer to next higher level of maintenance.Adjust the frequency of the “on-coming’’ set a little higher than the “on-line’’ set. Then reduce the frequencyslowly with frequency adjust rheostat (29) until the synchronizing lights (25) remain on or off a 2 to 3 se-cond intervals.Carefully observe the synchronizing lights of the “on-coming” set and, at the instant both lights go dark placethe CKT BRK switch (30) of the “on-coming” set to the CLOSE position. When the CKT BRK indicator light(31 ) illuminates, the sets are operating in parallel.The kilowatt meter and AC ammeter indicate percentages and do not indicatetrue KW and ampere readings. Equipment damage could result if caution isnot observed.With no external load on the paralleled sets, adjust the frequency adjust rheostat (29) of the “on-coming”set until both rated load meters (kilowatt) read zero. Adjust the voltage adjust rheostat of the “on-coming”set until the percent of rated current meters (ammeters) on both sets read zero. Turning counterclockwisewill decrease readings.Apply load to the sets. The kilowatt load should divide so that the load on each set is equal. If the loadand current are not shared equally adjust the voltage and frequency rheostats of the “on-coming” set untilthe load and current are divided equally between the generator sets.The current should divide so that the observed difference between the current on any phase between the“on-line” and “on-coming” sets is not more than 20 percent. If the readings are not within 20 percent, notifyhigher level maintenance.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business