ARMY TM 9-6115-464-12AIR FORCE TO 35C2-3-445-1NAVY NAVFAC P-8-624-12NOTEIf the reverse power indicator (16) of either set illuminates and the main load contac-tor opens, open the main power switch and reparallel the generator sets.When generator sets are being operated in parallel, one or more operatorsmust remain with the sets to monitor the rated load and current meters.Equipment damage could result if caution is not observed.NOTEThree generator sets can be operated in parallel. Paralleling procedures are thesame as those described above. One generator set at a time is brought on line.Prior to removal of generator sets from parallel operation, make sure the loaddoes not exceed the full load rating of generation set(s) remaining on line,Equipment damage could result if caution is not observed.j.To remove a generator set from parallel operation, place the circuit breaker switch of the set in the OPENposition. Stop the set described in paragraph 2–7.Figure 2-7. Voltage Reconnection Board2-15
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business