TM 5-6115-585-12NAVFAC P-8-623-12TO-35C2-3-455-1TM-05684C/05685B-12Figure 2-3.Control Panelincrease frequency, pushing speed control knob in willdecrease frequency. For fine control turn knob CW toincrease and CCW to decrease.f. Place ammeter-voltmeter transfer switch inposition corresponding to the position of the reconnec-tion switch. Adjust voltage adjust rheostat to desiredvoltage as read on voltmeter. Turn rheostat clockwiseto increase voltage or counterclockwise to decreasevoltage.g. Place AC circuit breaker in ON position. Adjustspeed control to obtain full load frequency perparagraph 1-10.b.h . P l a c e a m m e t e r - v o l t m e t e r t r a n s f e r s w i t c h inposition to check percent rated current for either1-phase 120 V. output, l-phase 120/240 V. output, or3-phase 120/208 V. O Utput. See table 2-1 and figure2-3.N O TEFor 3-phase output each of the four posi-t i o n s i n d i c a t e d i n t a b l e 2 - 2 m u s t bechecked.Observe percent rated current meter. Do not exceed5% load difference between phases. A 0.8 power factorTable 2-2. Reconnection Switch Positions2-4Change 2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business