TM5-6115-584-34NAVFAC P-8-622-34TO 35C2-3-456-2TM 05682C-34(2)Locate top panel assembly (16) by aligning holesin top panel assembly (16) with captive nuts in left panelassembly (2), right panel assembly (13) andfront panel assembly(12), and with holes in side closure assembly (5) and rearclosure assembly (17).(3)Install top panel assembly (16) to left panelassembly (2), right panel assembly (13) and front panel assembly(12) with eleven screws (18) and eleven washers (19). Installtop panel assembly (16) to side closure assembly (5) and rearclosure assembly (17) with seven screws (20), 14 washers (21 and22) and seven locknuts (23) (as listed in Table 10-1, item 11).(4)Torque screws (18) to(5)Torque screws (20) to1 0 - 5 .POSTINSTALLATIONPROCEDURES.WARNING18 ± 2 in.-lbs dry.16 ±2 ft-lbs dry.The local safety office and PreventativeMedicine Support Activity must be consultedprior to initial CARC painting.Inspect ASK and generator set for any areas where touch-uppainting may be required.Perform necessary touch-up painting inaccordance with MIL-T-704 using paint colors green 383, brown383, and black as required by FED-STD-595.10-14Change 6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business