P-9-TM-457-35 T. O. 35C2-3-442-2
TM-07464A-35 TM 5-6115-457-34
Table 1-3. Time Standards (continued)
MAINTENANCE OPERATIONS
MAN-HOURS
Wheel Mounting Kit
(to install)
3.5
3.5
(to replace)
Load Bank
1.0
(to test)
2.0
(to repair)
4.0
(to overall)
Wire Harness
3.0
(to rebuild)