P-9-TM-457-35 T.O. 35C2-3-442-2
TM-07464A-35 TM 5-6115 -457-34
Table 1-3. Time Standards (continued)
MAINTENANCE OPERATIONS
MAN-HOURS
Blower Assembly
(to replace)
1.0
(to repair)
1.0
12 Electric Winterization Kit (Regular and Auxiliary)
1.0
(to overhaul)
(to rebuild)
1.0
Heater Assembly
(to replace)
1.0
(to repair)
1.0
1.0
(to overhaul)
Coolant Pumps
1.0
(to replace)
1.0
(to repair)
Heat Exchange (Coil)
0.2
(to inspect)
0.2
(to test)
0.5
(to replace)
1.0
(to repair)
(to test)
0.2
0.2
(to replace)
Semi-Conductors
0.2
(to inspect)
0.1
(to test)
0.5
(to replace)
1-59