P-9-TM-457-35
T.0. 35C2-3-442-2
TM-07464A-35
TM 5-6115-457-34
Table 1-3. Time Standards (continued)
MAN-HOURS
MAINTENANCE OPERATIONS
10 Sub Base Assembly
6.0
(to replace)
2.0
(to repair)
Main Fuel Tank
1.0
(to replace)
2.0
(to repair)
0.5
(to test)
1.0
(to replace)
Fuel Burning Winterization Kits (Auxiliary)
1.0
(to replace)
2.0
(to repair)
3.0
(to overhaul)
3.0
(to rebuild)
Fuel Pumps
1.0
(to repair)
Control Assembly
1.0
(to repair)
Terminal Board
0.5
(to replace)
0.5
(to test)
0.2
(to replace)
Wire Harness
2.0
(to rebuild)
Flame Switch
0.5
(to replace)
Burner Assembly
1.0
(to replace)
1-58