• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Fire Extinguisher
Figure 2-13. Heater stopping instructions.

Generator Set, Diesel Engine: 200 Kw, 60 Cycle, Ac, 120/208V, 240/416V, 3 Phase. Convertible Fo 167 Kw, 50 Cycle 120/208V, 240/416V, 3 Phase Page Navigation
  20    21    22    23    24  25  26    27    28    29    30  
img
TM 5-6115-400-12
STEP 4.
TURN HEATER CONTROL SWITCHES TO
ON POSITION. (DO NOT START BOTH
HEATERS AT SAME TIME)
NOTE
Figure 2-12 (1). Heater starting and operating
WHEN HEATER INDICATOR LIGHTS
instructions.
BURN
AUTOMATICALLY
THE
6115-400-12/2-12 (1)
HEATERS  ARE  LIGHTED  AND
STARTING TO HEAT THE UNIT.
Note.
When  heater  indicator  lights  burn
automatically the heaters are lighted and starting to heat
STEP 5.
CLOSE ALL DOORS AND SIDE PANELS.
the unit.
NOTE
Note. If after two minutes a heater is not lit, turn
IF AFTER TWO MINUTES A HEATER
heater control switch off for above two minutes before
IS
NOT
LIT,
TURN  HEATER
attempting to restart the heater.
CONTROL SWITCH OFF FOR ABOUT
TWO
MINUTES
BEFORE
Caution: Never discharge ether into hot engine.
ATTEMPTING  TO  RESTART  THE
HEATER.
STEP 6.
AFTER AN INTERVAL OF
APPROXIMATELY ONE HOUR AFTER THE
HEATERS HAVE OPERATED, START THE
UNIT AND OPEN CONTROL PANEL AND
LOUVER DOORS.
6115-400-12/2-12 (2)
Position valves.
Figure 2-12 (2)-Continued.
2-19


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.