Figure 4-1. Overshoot and Undershoot Chart Recording
OVERSPEED  PROTECTIVE  DEVICE  TEST

TM-9-6115-464-34 Generator Set Diesel Engine Driven Tactical Skid Mtd 15 Kw 3 Phase 4 Wire 120/208 and 240/416 Volts Manual
Page Navigation
  366    367    368    369    370  371  372    373    374    375    376  
ARMY TM 9-6115-464-34 AIR FORCE TO 35C2-445-2 NAVY  NAVFAC  P-8-624-34 (b)   Convert each of the values obtained in (a) above to a percentage of rated voltage by dividing by the rated voltage and multiplying by 100. This is the voltage regulation expressed in percent. (c)  Repeat paragraph 4-15d. (1) above substituting frequency for voltage. (d)  Compare the results tabulated in paragraphs 4-15d. (1) and 4-15d. (6) (c) with the requirements of Table 4-1. 4-15. FREQUENCY ADJUST RANGE TEST a. General. It is necessary that the frequency of a generator set be adjustable to provide rated frequency at various load conditions as required in certain applications and to synchronize two or more generator sets for parallel operation. b. Apparatus. Instrumentation for measuring load conditions, field voltage and current, and ambient temperature shall be as described and illustrated in MIL–HDBK-705. c. Procedure. (1)    Preparation for Test. Connect the load and field instrumentation in accordance with the applicable figure of MIL–HDBK–705, method 205.1, paragraph 205.1.10. (2)   Test. (a)   Start and operate the generator set and allow it to stabilize at rated load, rated voltage and rated frequency. During this period, readings of the load and field instrumentation shall be recorded at minimum intervals of 10 minutes. If necessary, adjustments to the load, voltage and frequency may be made to maintain rated load at rated voltage and rated frequency. However, adjustments available to the operator, specifically adjustments to voltage and frequency adjust devices. Adjustments to the load, voltage or frequency shall be noted on the stabilization data sheet. Stabilization will be considered to have occurred when four consecutive voltage and current readings of the exciter field either remain unchanged or have only minor variations about an equilibrium condition with no evident continued increase or decrease in value after the last load, voltage or frequency adjustment has been  made. (b)  No further adjustments shall be made to any set control for the remainder of this test except for the control panel frequency adjust device. (c)  For each of the conditions in the following steps allow approximately 2 minutes between each adjustment and the subsequent instrument readings. (d)   Adjust the generator set frequency for the specified record all instrument readings. (e)  Adjust the generator set frequency for the specified record all instrument readings. (f)   Reduce the load to zero. maximum frequency at rated load. Read and minimum frequency at rated load. Read and (9)  Adjust the generator set frequency for the maximum attainable frequency. Read and record all instrument readings. If the over frequency or overspeed protection device actuates, read and record all instrument readings just prior to the point of actuation and note on the data sheet that the protection device actuated. 4-15







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.