TM 9-6115-662-13&P7. Install eight lock washers (10), flat washers (9), and screws (11) that secure control panelassembly (12).8. Install lens (l), O-ring (14), and lamp (2).9. Close the control panel access cover (7) and secure with clamping catch (8).4-17 SWITCH BOX LOAD TERMINAL MAINTENANCE.This task covers: a. Removalc. Installationb. RepairINITIALSETUPToolsEquipmentConditionsTool Kit, General Mechanic’sReference(item 1, appendix B)Both generator sets shut down,paragraph 2-5.3.1.Materials/PartsTrailer support devices arelowered, paragraph 2-3.2.1.Terminal, LoadWire, Round Steel, 0.072 inch diameterQQ-W-423 Composition 302REMOVAL1. Remove 21 screws (2, figure 4-14), lock washers (3), and flat washers (4).2. Release clamping catch (5) and open load terminal door (l).CAUTIONThe control panel connector P3 is connected to connector J4. Movement ofthe switch box cover is limited. To prevent damage to control panel wiringharness, use caution removing switch box cover. Failure to observe thiscaution can result in equipment damage.3. Carefully position switch box cover (15) in front of switch box assembly.4. Disconnect P3 (6) from J4 (7).5. Remove switch box cover (15).6. Disconnect external load terminal lead from the defective terminal (14).NOTEFor removal of ground load terminal go to step 8.4-29
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business