TM 9-6115-660-13&PINSTALLATION1. Install resistor (5, 6, or 11), two screws (10), flat washers (7), lock washers (8), and nuts (9).2. Solder leads to resistor.3. Position relay board assembly (4) and install four flat washers (3), lock washers (2), and screws (1).5-15 CAPACITORS C1-C4 MAINTENANCE.This task covers: a. Testc. Installationb. RemovalINITIALSETUPToolsEquipmentConditionsTool Kit, General Mechanic’sReference(item 1, appendix B)Multimeter (item 3, apendix B)Both generator sets shut down; paragraphSoldering Gun (item 3, apendix B)2-5.3.3. Trailer handbrakes set, front supportleg/landing lowered, and rear leveling-supportMaterials/Partsjack lowered; paragraph 2-3.2.1. Switch boxSoldercover open.TEST1. Remove four screws (1, figure 5-19), lock washers (2), and flat washers (3) and invert relay boardassembly (4).2. Discharge capacitors C1 and C2 (12) and C3 and C4 (13) by shorting across terminals.3. Isolate capacitors C1 and C2 at E5 and E2 respectively. Tag and remove wire W11-34 at TB1-18 toisolate capacitors C3 and C4.4. Disconnect one end of capacitor and check continuity between terminals, using a multimeter in the 200kohms range. The meter needle should deflect and return to infinity within a few seconds. (If using adigital meter, the readout should run upscale to infinity).5. If capacitor fails test, replace it. Refer to removal and installation procedures.6. If capacitor passes test, place relay board assembly (4) in position and secure with four flat washers (3),lock washers (2), and screws (1).REMOVAL1. Remove four screws (1), lock washers (2), and flat washers (3) and invert relay board assembly (4).2. Unsolder capacitor (12 or 13) leads from stud terminals (14) and remove capacitor,5-35
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business