Section II. MAINTENANCE ALLOCATION CHART
FOR
POWER UNITS
AND POWER PLANTS
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE LEVEL
TOOLS
GROUP
MAINTENANCE
DIRECT
GENERAL
AND
NUMBER
COMPONENT ASSEMBLY
FUNCTION
UNIT
SUPPORT SUPPORT
DEPOT
EQUIPMENT
REMARKS
C
O
F
H
D
00
POWER PLANT/
INSPECT
0.2
A.B.C
POWER UNIT
0.1
A.D
0100
GENERATOR
SET
INSPECT
0.2
0.5
A
TEST
1.0
1.0
F.G
SERVICE
0.3
0.3
E.F.G
ADJUST
0.3
F.G
REPAIR
1.5
1.5
E.F.G
REMOVE/INSTALL
1.5
1.3
REPLACE
1.5
1.3
J
0200
ELECTRICAL SYSTEM
B.C
0201
POWER CABLES
INSPECT
0.1
A
TEST
0.3
1.2
REMOVE/INSTALL
0.5
1
REPAIR
1.1
1.3.4
K
REPLACE
0.5
1
J
0202
SWITCH BOX ASSEMBLY
INSPECT
0.1
0.1
A
REMOVE/INSTALL
0.5
1
REPAIR
0.3
1.5
REPLACE
0.5
1
J
020201
RELAY
BOARD
TEST
1.0
1.3
ASSEMBLY
REPAIR
1.0
1.3
02020101 RELAYS
TEST
0.2
1.3
REMOVE/INSTALL
0.1
1
REPLACE
0.1
1
J
020202
RELAY
, PERMISSIVE
TEST
1.0
1.3
PARALLELING
REMOVE/INSTALL
0.5
1
REPLACE
0.5
1
J
020203
LIGHTS/LAMPS
TEST
0.2
1.2
REMOVE/INSTALL
0.2
1
REPAIR
0.3
1, 2
REPLACE
0.2
1
J
020204
SWITCHES
TEST
0.2
1.2
REMOVE/INSTALL
0.2
1
REPLACE
0.2
1
J
020205
LEADS/HARNESSES
TEST
0.3
1.3
REMOVE/INSTALL
0.4
1
REPAIR
0.9
1.3.4
REPLACE
0.4