TM 9-6115-659-13&P
Section III. MAINTENANCE PROCEDURES
5-5
GENERAL.
This section covers Direct Support level maintenance procedures for power plant/power unit components that are not
covered in the generator set technical manual, engine technical manual, or trailer technical manuals.
5-5.1
Generator Set Maintenance. Refer to generator set TM 9-6115-641-24 and engine TM 9-2815-252-24.
5-5.2
Trailer Chassis Maintenance. Refer to TM 9-2330-202-14&P for Power Plant AN/MJQ-35 and Power Unit PU-
797, TM 9-2330-392-14&P for Power Plant AN/MJQ-35A and Power Unit PU-797A, and TM 9-2330-213-14&P for Power
Plant AN/MJQ-36.
5-6
GENERATOR SET MAINTENANCE.
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP
Tools
Tool Kit, General Mechanics
(item 1, appendix B)
Torque Wrench, 0-150 ft-lb
(item 3, appendix B)
Lifting Device, 1750 lbs. lifting capacity
(item 3, appendix B)
Materials/Parts
Nuts, Self-locking
Washers, Lock (item 5, appendix I)
Equipment Conditions
Reference
Both generator sets shut down; paragraph -5.3.3. Trailer
handbrakes set, front support leg/landing lowered, and
rear leveling-support jack lowered; paragraph 2-3.2.1.
Power cable leads (AN/MJQ-35, AN/MJQ-35A, and
AN/MJQ-36) or load cable leads (PU-797 and PU-797A)
and ground cable disconnected from generator set load
terminals; paragraph 4-12 and TM 9-6115-641-10.
External fuel source disconnected; paragraph 2-7.5.
Personnel Required
Two
REMOVAL
1.
Remove four nuts (5, figure 5-5), lock washers (4) and cap screws (1) from generator output plate (2).
Change 2 5-8