TM 9-6115-658-13&P 4-31 INSTALLATION1. Position new load terminal (8) on mounting plate so that alignment pin fits in hole provided. 2. Install and tighten the hex nut (6). 3. Install the leads (5). 4. Install internal tooth lock washer (4) and thread hex nut (3) on load terminal (8) and tighten. 5. Close switch box terminal cover (1) and switch box cover (2), and secure with clamping catches (11) and (12). 4-18 TERMINAL LOAD COVER MAINTENANCE. This task covers: a. Removal b. Installation INITIALSETUPToolsEquipmentConditionsTool Kit, General Mechanic’s Reference (item 1, Appendix B) Both generator sets shut down, para 2-5.3.3. Materials/PartsNone REMOVAL1. Release clamping catches (1, Figure 4-16) and open switch box cover (2). 2. Release clamping catches (3) and open load terminal cover (4). 3. Remove six rivets (6) and remove load terminal cover (4) from switch box (7). 4. Remove four rivets (6) and two clamping catch strikes (5). Retain strikes for installation on new cover. NOTE If replacing load terminal cover, steps 3 and 4 must be performed. INSTALLATION1. Install load terminal cover (4) on switch box (7) with six rivets.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business