TM 9-6115-658-13&P
4-52
INSTALLATION
a. Position stowage rack (12) over mounting holes in trailer fenders (1) and (17).
b. Install four cap screws (2), four flat washers (22) ), backing plate (23), lock washers (21), and self-locking
nuts (20).
c. Repeat step b. for each of the three remaining backing plates.
4-28 TERMINAL, GROUND REPLACEMENT.
This task covers:
a.
Removal
b. Installation
INITIAL SETUP
Tools
Equipment Conditions
Tool Kit, General Mechanic's
Reference
(item 1, Appendix B)
Trailer handbrakes set and front support
Materials/Parts
leg/landing leg lowered; paragraph 2-3.2.1.
Washer, Lock
Both generator sets shut down; paragraph
2-5.3.3.
REMOVAL
NOTE
Figure 2-8 contains location of ground terminal.
1. Loosen nut (1, Figure 4-28) and remove ground wire (2) from ground terminal (3).
2. Remove nut (4), internal tooth washer (5), and ground terminal (3).
INSTALLATION
1. Install ground terminal (3), internal tooth washer (5), and nut (4). Tighten nut (4).
2. Install ground wire (2) in slot of ground terminal (3) and tighten nut (1).