ARMY TM 9-6115-604-12NAVY NAVFAC P-8-633-12NOTEThe clevises should be installed into the forward lifting eyes only. This permits the bottom of the radiatorto rock slightly forward during lifting, away from the engine and cooling fan.(14)See Figure 4-42. Install a 7 inch (178 mm) clevis, with a 3/4 inch (20 mm) pin, into each of the lifting eyes of the forward upper radiator flanges.(15)Install a metal or fabric sling through each clevis. Allow a maximum of 4 inches (102 mm) of slack between the sling and the center of the top of the radiator. The length of the slingshould be a minimum of78 to 80 inches (1981 to 2032 mm) so that it will span the radiator.(16)Hook an overhead hoist with a capacity of 1200 pounds (540 kg), and a minimum lift of 112 inches (2845 mm), under the center of the sling.(17)Remove hexagon head capscrews (35 and 39, Figure 3-17), hexagonal nuts (36 and 40), flat washers (37), and lockwashers (38 and 41) to remove radiator (42) and left and right hand radiator supports (43 and 44).(18)Lift the radiator 1 to 2 inches (25 to 50 mm), or until just clear of the skid bases and withdraw it from the generator set housing.c.Install.Figure 4-42. Lifting of Radiator4-118
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business