ARMY TM 9-6115-604-12
NAVY NAVFAC P-8-633-12
NOTE
The clevises should be installed into the forward lifting eyes only. This permits the bottom of the radiator
to rock slightly forward during lifting, away from the engine and cooling fan.
(14)
See Figure 4-42. Install a 7 inch (178 mm) clevis, with a 3/4 inch (20 mm) pin, into each of the lifting eyes of
the forward upper radiator flanges.
(15)
Install a metal or fabric sling through each clevis. Allow a maximum of 4 inches (102 mm) of slack between
the sling and the center of the top of the radiator. The length of the sling should be a minimum of 78 to 80
inches (1981 to 2032 mm) so that it will span the radiator.
(16)
Hook an overhead hoist with a capacity of 1200 pounds (540 kg), and a minimum lift of 112 inches (2845
mm), under the center of the sling.
(17)
Remove hexagon head capscrews (35 and 39, Figure 3-17), hexagonal nuts (36 and 40), flat washers (37),
and lockwashers (38 and 41) to remove radiator (42) and left and right hand radiator supports (43 and 44).
(18)
Lift the radiator 1 to 2 inches (25 to 50 mm), or until just clear of the skid bases and withdraw it from the
generator set housing.
c. Install.
Figure 4-42. Lifting of Radiator
4-118