ARMY TM 9-6115-464-12
AIR FORCE TO 35C2-3-445-1
NAVY NAVFAC P-8-624-12
(4) Installation.
(a) Position housing (36, Figure 5-12), install heater elements (35), nut and captive washers assemblies
(34), flatwashers (33) and screws (32).
(b) Connect electrical leads to terminal board assembly.
(c) Install load bank assembly as outlined in paragraph 5-21a above.
i.
Load Reject Relay. Visually inspect load reject relay (37, Figure 5-12) for insecure mounting, loose elec-
trical connections, dents, cracks and evidence of shorting or other damage.
j.
Wiring Harness.
(1)
(2)
(3)
(4)
(5)
Removal. Tag and disconnect wiring harness wires, connectors, and terminals as required for ac-
cess to other components or replacement of damaged parts.
Cleaning and Inspection.
(a) Clean wiring harness with filtered compressed air and a soft bristle brush or wipe with a clean,
lint-free cloth lightly moistened with an approved solvent.
(b) Visually inspect wiring harness for burns, bent, corroded or otherwise damaged connectors and
terminals.
(c) Check insulation for bums, chafing, and deterioration
Testing. Check continuity of individual wires with a mulitmeter or continuity light using Figure 5-13
as a guide.
Do not use acid core solder on electrical components. Equipment damage
could result if caution is not observed.
Repair. Replace damaged wires, terminals, and connectors by unsoldering connections, installing
replacement parts and soldering connections.
NOTE
If more than 30 percent of the wires are damaged, replace the wiring harness and
forward it to higher level for rebuilding.
Installation. Connect wiring harness wires, connectors and terminals after replacement of damaged
parts.
5-57