ARMY TM 9-6115-464-12AIR FORCE TO 35C2-3-445-1NAVY NAVFAC P-8-624-12(3) Assembly and Installation.(a) On bases ( 45, Figure 4-38, sheet 1 of 3), screw on lamps (44), and install cover (43).(b) Install panel light assemblies (42), and nut (41).(c) Reconnect electrical leads to panel light assemblies.n.Control Cubicle Wiring Harness Assembly.(1)(2)(3)(4)(5)Removal.(a)(b)(c)(d)(e)(f)Tag and disconnect electrical leads to control cubicle assembly.Remove self-locking nut (46, Figure 4-38, sheet 1 of 3) and screw (47) to remove damp (48).Remove self-locking nut (49) to remove clamp (50). Do not remove self-locking nut (51) andscrew (52) unless replacement is necessary.Remove self-locking nut (53) and screw (54) to remove damp (55).Remove self-locking nut (56) and screw (57) to remove damp (58).Remove self-locking nut (59) and screws (60) to remove wiring harness assembly (61).Cleaning and Inspection.(a)(b)(c)(d)Clean wiring harness assembly with filtered compressed air and a soft bristle brush or wipe witha clean, lint-free cloth lightly moistened with an approved solvent.Visually inspect wiring harness connector for cracks, corrosion, bent or broken pins, and strippedor damaged threads.Inspect insulation for burns, chafing, and deterioration.Check electrical leads for burned, bent, corroded, damaged or missing terminals.Testing. Check continuity of individual wires with a multimeter or continuity light using figures FO-1and FO-2 as a guide.Do not use acid core solder on electrical wiring. See appropriate manual inAppendix A for wiring installation practices. Equipment damage could resultif caution is not observed.Repair. Replace damaged wires, terminals, and connector by unsoldering connections, installing replace-ment parts and soldering connections.NOTEIf more than 30 percent of the wires are damaged or have been repaired, replacethe wiring harness and forward it to high level maintenance for rebuilding.Installation.(a)(b)(c)(d)(e)(f)Install wiring harness assembly (61, Figure 4-38, sheet 1 of 3), screws (60), and self-lockingnut (59).Install clamp (58), screw (57), and self-locking nut (56).Install clamp (55), screw (54), and self-locking nut (53).If removed, install screw (52) and self-locking nut (51). Install damp (50) and self-locking nut (49).Install damp (48), screw (47), and self-locking nut (46).Connect electrical leads to control cubicle assembly.4-93
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business