TM 5-6115-585-34
NAVFAC P-8-623-34
TO-35C2-3-455-2
TM-05684C/05685B-34
1. Screw (1O)
14. Screws (4)
2. Lockwasher (10)
15. Linear reactor
3. Nut (10)
16. Screw (12)
4. Screw (2)
17. Nut(12)
5. Nut (2)
18. Connector (3)
6. Transformer
19. Screw (4)
7. Transformer
20. Nut (4)
8. Screw(6)
21. Connector
9. Lockwasher (6)
22. Nut (4)
10. Load terminal board
23. Bridge rectifier assembly
11. Screw (4)
24. Output control box
12. Lockwasher (4)
25. Load terminal (4)
13. Access panel
Figure 6-9. AC Output Control Assembly (Sheet 2 of 2)
(4) Convenience Receptacle (J14) (MEP-003A
only) (see figure 6-10). Attach new receptacle (13) to front
panel with two screws (18) and nuts ( 19). Attach receptacle
cover (16) and gasket (17) to front panel with four screws
(14) and nuts ( 15). Attach two tagged leads to receptacle per
wiring diagram. figure 1- 1.
(5) Linear Reactor (L1) (see figure 6-9). Attach
new reactor ( 15) to side panel with four screws ( 14). Connect
six tagged leads to reactor per wiring diagram, figure 1-1.
(6) Connector Assemblies (see figure 6-9). Attach
connectors (18 and 21 ) to output control box with screws ( 16
and 19) and nuts (17 and 20).
(7) Reconnection Switch (S6) and Transformers
(CT 1 and CVT 1 ). Assemble transformers (6 and 7, figure
6-9) with screws (4) and nuts (5). Attach tagged wires to
transformers and reconnection switch (1, figure 6-10). Refer
to wiring diagram, figure 1-1. Install transformers (6 and 7.
figure 6-9) with screws (1). nuts (3), and lockwashers (2).
Install reconnection switch (1. figure 6-10) with screw (3).
lockwasher (4), screw (5), spacer (6). lockwasher (7), and nut
(8).
(8) Bridge Rectifier Assembly (see figure 6-
9). Position bridge assembly (23) to ac output control box
and attach with nuts (22). Connect electrical leads and
remove tags.
NOTE
If any difficulty is encountered in reconnecting the jumpers
to the reconnection switch, refer to figure 6-10.1 and 6-10.2.
Change 7
6-19