TM 5-6115-584-34NAVFAC P-8-622-34T0-35C2-3-456-2Table 6-6. Testing Bridge AssemblyCheck Resistance in BothTo Test DiodeDirections Between TerminalsA4-CR1A4-CR2A4-CR3A4-CR4A4-CR5A4-CR6c. Removal.2-51-53-52-41-43-4(1) Reconnection Switch (S6) and Transformers (CT1 andCVT1). Due to the large number of wires connected to theseitems, they are removed from the control box with the wiringconnected. Remove screw (3, figure 6-10) and lockwashers (4).Remove screws (5), nuts (8), lockwashers (7) and spacers (6).Remove switch (1) and wiring. Remove transformers (6 and 7,figure 6-9) by removing screws(l), nuts(3) and lockwashers (2).Tag and remove wiring from transformers and switch.Disassemble transformers by removing screws(4) and nuts(5).(2) Load Terminal Board (TB1) (see figure 6-9). Disconnectload from load terminal board. Remove six screws (8) andlockwashers (9), attaching board (10) to control box (24) andremove board. Tag and disconnect four wires to load terminals(25).(3) AC Circuit Breaker (CB1). Remove side access panel(13, figure 6-9) by removing screws (11) and lockwashers (12).Tag and remove leads connected to circuit breaker (9, figure6-10). Remove six screws (10) attaching breaker (9) to frontpanel (2) and remove breaker.(4) 15 Amp Circuit Breaker (CB3) (see figure 6-10). Removeside access panel (13, figure 6-9). Tag and disconnect two elec-trical leads to 15 amp circuit breaker (11, figure 6-10). RemoveTM-0568C-34two screws (12) attaching breaker to front panel of output con-trol box (2) and remove breaker.(5) Convenience Receptacle (J14). Remove four screws (11,figure 6-9) and lockwashers (12) attaching side access cover (13)to output control box and remove cover. Remove four screws(14, figure 6-10) and nuts (15) attaching receptacle cover to frontpanel and remove cover (16) and gasket (17). Tag and discon-nect two leads from receptacle. Remove two screws (18) andnuts (19) attaching receptacle to front panel and remove recep-tacle (13). Disconnect two leads from the receptacle and tapeeach lead end, separately (figure 1-7).(6) Linear Reactor (L1) (see figure 6-9). Remove side ac-cess panel (13). Tag and disconnect six leads to linear reactor(15). Remove four screws (14) attaching reactor to side panelof output control box and remove reactor.(7) Connector Assemblies (see figure 6-9). Remove screws(16 and 19) and nuts (17 and 20) attaching connectors (18 and21) to output control box and remove connector. Tag and discon-nect wires from wiring harness to connector. Reconnect taggedwires to new connector.(8) Bridge Rectifier Assembly (see figure 6-9). Tag andremove leads to rectifier assembly (23). Remove nuts (22)holding bridge assembly to ac output control box and removebridge assembly. Replace bad diodes or resistors as necessary.d. Install.(1) Load Terminal Board (TB1). Attach four tagged wiresto load terminals per wiring diagram, figure 1-7. Attach loadterminal board (10, figure 6-9) to control box (24) with six screws(8) and lockwashers (9).(2) AC Circuit Breaker (CB1) (see figure 6-10). Attach cir-cuit breaker (9) to front panel of output control box with sixscrews (10). Attach six tagged leads to terminals 3,4,7,8, 11,and 12 of breaker per wiring diagram, figure 1-1. Replace sideaccess panel.(3) 15 Amp Circuit Breaker (CB3) (see figure 6-10). Attachnew breaker (11) to front panel of output control box (2) withtwo screws (12). Attach two tagged leads to 15 amp circuitbreaker per wiring diagram, figure 1-1.Change 46-17
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business