TM 9-6115-662-13&PTable 4-1. Unit Preventive Maintenance Checks and Services for AN/MJQ-40, PU-803, and PU-804.NOTEThis PMCS table lists the checks and services as performed on a single PowerUnit. These procedures must be duplicated on each Power Unit that makesup the AN/MJQ-40.Unit B of the ANMJQ-40, PU-803, and PU-804 does not have a switch box.Maintenance for the switch box is only applicable to Unit A of theAN/MJQ-40.ItemItem to beNot Fully MissionNo.IntervalChecked or ServicedProcedureCapable if:WARNINGBefore performing any maintenance that requires climbing on or under trailer, makesure that trailer handbrakes are set, trailer front landing leg is lowered, and rearleveling-support jack is lowered. Injury to personnel could result from trailer suddenlyrolling or tipping.1Semi-POWER CABLEInspect power cable for worn,Power cable isannuallyfrayed or cracked insulation,unserviceable.loose terminal lugs, and looseconnections. Tighten as needed.2Semi-SWITCH BOX ASSEMBLYa. Inspect switch box assembly.annuallyRefer to paragraph 4-12.b. Inspect mounting brackets forcracks or loose or missinghardware.3Semi-MOUNTING RAILSInspect for cracks andMounting rail isannuallydeformation.cracked or deformed.4Semi-FIRE EXTINGUISHERa. Inspect for broken seal andannuallydamage to handle.b. Weigh to determine whetherFire extinguisher notcharge is sufficient. Weight is charged.about 13 pounds when fullycharged. If weight is 12.5pounds or less, send tospecialized activity forrecharging.4-10
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business