b.
c.
TM 9-6115-660-13&P
Pull power cable (1 or 2) through stuffing tube until ends of power cable are free of stuffing tube
body (11).
Remove washer (9), seal (10), and stuffing tube compression nut (8) from power cable (1 or 2). Place
items back on stuffing tube and tighten.
3. Disconnect power cable from switch box.
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
Release clamping catches (11, figure 4-10) and open switch box cover (1).
Remove two screws (2) and lock washers (3) from contactor terminal shield (4) of contactor
associated with power cable being removed.
Remove contactor terminal shield (4).
Remove nuts (5), lock washers (6), and flat washers (7) from contactor terminals (9).
Lift terminal leads (8) from contactor terminals (9). Remove only the terminal leads associated with
electrical leads of power cable being removed. If necessary to remove other terminal leads to access
those for power cable being disconnected, reinstall other terminal leads onto contactor terminals (9).
Install flat washers (7), lock washers (6), and terminal nuts (5) on contactor terminals (9).
Remove hex nuts (6, figure 4-12) and internal tooth washers (7) from ground and L0 terminals (9) of
switch box.
Remove only the wire associated with the power cable being replaced. If necessary to remove other
terminal leads to access those for power cable, reinstall other terminal leads on terminal (9).
Place internal tooth washers (7) over the end of terminals (9) and loosely install the hex nuts (6).
Remove stuffing tube compression nut (10) from stuffing tube body (13).
Pull power cable (3 or 4) through stuffing tube until ends of power cable are free of stuffing tube
body (13).
Remove washer (11), seal (12), and stuffing tube compression nut (10) from power cable (3 or 4).
Place items back on stuffing tube and tighten.
4. Remove power cable from clamps.
a. Remove self-locking nuts (6, figure 4-11), screws (3), and flat washers (4) securing clamps (5) to
trailer. Remove cable (3 or 4).
b. Remove clamps (5) off power cable (3 or 4).
INSTALLATION
1. Install stuffing tube compression nut (10, figure 4-12), washer (11), and seal (12) on end of power
cable (3 or 4) having leads with terminal lugs.
4-23