TM 9-6115-660-13&PTable 4-1. Unit Preventive Maintenance Checks and ServicesItem to beItemIntervalChecked orProcedureNot Fully MissionNoServicedCapable if:WARNINGBefore performing any maintenance that requires climbing on orunder trailer, make sure that trailer handbrakes are set, trailer frontlanding leg/support leg is lowered, and leveling-support jack islowered. Injury to personnel could result from trailer suddenlyrolling or tipping.1Semi-POWER CABLESInspect power cables for worn, frayed,Power cable isAnnually(AN/MJQ-37 ANDor cracked insulation, loose terminalunserviceable.AN/MJQ-38 ONLY)lugs, and loose connections. Tighten asneeded.2Semi-SWITCH BOXInspect switch box assembly (refer toAnnuallyASSEMBLYparagraph 4-13).(AN/MJQ-37 ANDAN/MJQ-38 ONLY)3Semi-TRAILER LIFTINGInspect for wear, damage, and looseAnnuallyRINGS (AN/MJQ-37attaching hardware. Torque to 315-347AND AN/MJQ-38lb.-ft. (427-470 N.m).ONLY)4Semi-MOUNTING RAILSInspect for cracks and deformationMounting rail isAnnuallycracked or deformed.5Semi-FIREa. Inspect for broken seal and damageAnnuallyEXTINGUISHERto handle.b. Weigh to determine whether chargeFire extinguisheris sufficient. Weight is 13 poundsnot charged.when fully charged. If weight is 12.5pounds or less, send to specializedactivity for recharging.4-12 Change 2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business