TM 9-6115-659-13&PTable 4-1. Unit Preventive Maintenance Checks and ServicesLocationItemIntervalProcedureNot Fully MissionNo.Item to Capable if:Check/Service1Semi-POWER CABLESInspect power cables for worn, frayed,Power cable isAnnually(AN/MJQ-35,or cracked insulation, loose terminalunserviceable.AN/MJQ-35A, ANDlugs, and loose connections. Tighten asAN/MJQ-36 ONLY) needed.2Semi-SWITCH BOXInspect switch box assembly (refer toAnnuallyASSEMBLYparagraph 4-13).(AN/MJQ-35,AN/MJQ-35A, ANDAN/MJQ-36 ONLY)3Semi-TRAILER LIFTING Inspect for wear, damage, and looseAnnuallyRINGS (AN/MJQ-35,attaching hardware. If loose orAND AN/MJQ-36damaged, refer to paragraph 4-21.ONLY)4Semi-TRAILER LIFTING Inspect for cracks, damage, or brokenAnnuallyBRACKETSwelds.(AN/MJQ-35 ANDAN/MJQ-36 ONLY)5Semi-MOUNTING RAILSInspect for cracks and deformationMounting rail isAnnuallycracked ordeformed.6Semi-FIREa. Inspect for broken seal and damageAnnuallyEXTINGUISHERto handle.b. Weigh to determine whether chargeFire extinguisheris sufficient. Weight is 13 poundsnot charged.when fully charged. If weight is 12.5pounds or less, send to specializedactivity for recharging.Change 2 4-13WARNINGBefore performing any maintenance that requires climbing on orunder trailer, make sure that trailer handbrakes are set, trailerfront landing leg/support leg is lowered, and leveling- supportjack is lowered. Injury to personnel could result from trailersuddenly rolling or tipping.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business