TM 9-6115-658-13&P
B-7
Section II. MAINTENANCE ALLOCATION CHART (Contd)
FOR
POWER PLANTS AN/MJQ-42 AND AN/MJQ-43
(1)
(2)
(3)
(4)
MAINTENANCE LEVEL
(5)
(6)
UNIT
DIRECT
SUPPORT
GENERAL
SUPPORT
DEPOT
TOOLS
AND
GROUP
NUMBER
COMPONENT/ASSEMBLY
MAINTENANCE
FUNCTION
C
O
F
H
D
EQUIPMENT
REFERENCE
CODE
REMARKS
CODE
06
Assembly, Switch Box
INSPECT
REPLACE
REPAIR
REMOVE/
INSTALL
0.1
0.1
0.5
0.3
0.5
1
1,2
1
A
F
0601
Assembly, Relay Board
TEST
REPAIR
1.0
1.0
1,3
1,3
060101
Relays
TEST
REMOVE/
INSTALL
REPLACE
0.2
0.1
0.1
1,3
1
1
F
0602
Relay, Permissive
Paralleling
TEST
REMOVE/
INSTALL
REPLACE
1.0
0.5
0.5
1,3
1
1
F
0603
Lights/Lamps
TEST
REMOVE/
INSTALL
REPAIR
REPLACE
0.2
0.2
0.3
0.2
1,2
1
1,2
1
F
F
0604
Switches
TEST
REMOVE/
INSTALL
REPLACE
0.2
0.2
0.2
1,2
1
1
F
0605
Leads/Harnesses
TEST
REMOVE/
INSTALL
REPAIR
REPLACE
0.3
0.4
0.9
0.4
1,3
1
1,3
1
F
0606
Terminal Load
INSPECT
REMOVE/
INSTALL
REPAIR
REPLACE
0.1
0.1
0.5
0.2
0.5
1
1
1
A
F
0607
Contactor
TEST
REMOVE/
INSTALL
REPLACE
0.2
0.5
0.5
1,3
1
1
F
0608
Resistors
TEST
REPLACE
0.2
0.4
1,3
1