TM 9-6115-604-34NAVFAC P-8-633-34Table 24. Electrical Troubleshooting (Continued)MALFUNCTIONTEST OR INSPECTIONCORRECTIVE ACTION8.PARALLELED GENERATOR SETS DO NOT DIVIDE LOAD EQUALLY IN PARALLEL ISOCHRONOUS MODEStep 1.Test bad sharing panel Al 04 in accordance with paragraph 6-23.WARNINGLethal static charges may be on generator G1 lines T1, T2, T3, L1, L2, or L3 when generatorset is shut down. Using an insulated (fiberglass) rod with a ground metal tip, dischargegenerator leads to ground prior to working on them.Step 2.Shut down generator set. Park load cables. Remove rear access panel to Cabinet B. Refer to Figure 10-3. Discharge generator G1 leads T1, T2, T3, L1, L2, and L3 to ground using an insulated (fiberglass) rod with grounded metal tip.Step 3.Refer to Figure 10-3. Make sure line T2 and not T1, T3, or TO is running through currenttransformerCT114.Correct as necessaryStep 4.Check wiring connections to current transformer CT114 terminals against FO-9. Be sure leads are not reversed.Tighten connections.Step 5.Test current transmitter CT114 in accordance with the Operator and Organizational Maintenance Manual.Replace if necessary in accordance with paragraphs 5-7 and 5-9.SECTION Ill. GENERAL MAINTENANCE2-5. GENERALThis section contains general in on repair practices such as cleaning, connecting and disconnectingwires, soldering, and welding.WARNINGCompressed air used for cleaning or drying can create airborne particles that may enter theeyes. Pressure shall not exceed 30 psi (207 kPa). Wearing of goggles is required to avoidInjury to personnel.WARNINGDry cleaning solvent, PD-680, type III, or equivalent, is flammable and moderately toxic to theskin, eyes, and respiratory tract. Assure adequate ventilation. Skin, eye, and respiratoryprotection is required to avoid Injury to personnel.2-18
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business