Figure G-6. Deck Covering.
APPENDIX H TORQUE  LIMITS

TM-9-6115-660-13P Power Plant Diesel Engine Driven 1-Ton Trailer Mounted (With Racks) 3Kw 60 Hz AN/MJQ-42 Manual
Page Navigation
  291    292    293    294    295  296  297    298    299    300    301  
TM  9-6115-660-13&P NOTES: 1.  Remove  damaged  gasket  material  from  switch  box  and  clean  thoroughly. 2. 3. Measure switch box for required length and cut rubber gasket material (1). Apply Type II adhesive (item 6, appendix E) to switch box and install gasket material. Figure G-7. Switch Box Gasket. G-14