TM  9-6115-660-13&P 5-12 PERMISSIVE PARALLELING RELAY MAINTENANCE. This  task  covers:  a.  Removal c.  Installation b.   Test INITIAL  SETUP Tools Tool  Kit,  General  Mechanic’s (item 1, appendix B) Multimeter  (item  3,  appendix  B) Power Oscillator, 50-420 Hz (item 3, appendix B) Materials/Parts Equipment   Conditions Reference Both generator sets shut down; paragraph 2-5.3.3.  Trailer  handbrakes  set,  front  support leg/landing  lowered,  and  rear  leveling-support jack  lowered;  paragraph  2-3.2.1.  Switch  box cover  open. Lock  washers 5-28 Figure 5-17. Permissive Paralleling Relay.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.