• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5-11. Switch Box Load Terminals.
5-9  RELAY  BOARD  HARNESS  W11  MAINTENANCE.

TM-9-6115-660-13P Power Plant Diesel Engine Driven 1-Ton Trailer Mounted (With Racks) 3Kw 60 Hz AN/MJQ-42 Manual
Page Navigation
  139    140    141    142    143  144  145    146    147    148    149  
TM  9-6115-660-13&P 6.  Refer  to  table  5-1  and  tag  and  disconnect  all  W9  wires  from  terminal  board  TB1  and  TB2. 7.  Refer  to  table  5-1  and  wiring  diagram  (figure  FO-1),  and  tag  and  disconnect  all  W9  wires  from switches S1, S2, and S10; indicator light housings XDS1 through XDS7; and permissive paralleling relay  PP. 8. Remove switch box wiring harness W9 from switch box. REPAIR Refer to figure G-3, appendix G. INSTALLATION 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Position harness in switch box. Using figures 5-7 and figure FO-1 as a reference, connect wires to switches S1, S2, and S10; indicator light housings XDS1-XDS7; and permissive paralleling relay PP. Refer to table 5-1 and connect all W9 leads to terminal boards TB-1 and TB-2. Position relay board (4, figure 5-12) and install four flat washers (3), lock washers (2), and screws (1). Install W9 harness leads (3, figure 5-11), internal tooth washer (2), and nut (1) on load terminals L0 and L3 (4). Place insulation sleeving on leads W9-20 and W9-49 and solder leads to resistor R3. Slide sleeving over solder joint and heat shrink. Refer to table 5-1 and install W9 wires (7, figure 5-10), flat washers (6), lock washers (5), and nuts (4) on contactor terminals (9). Refer to table 5-1 and install W9 leads (12) on terminals (13) using screws (11). Install contactor shield (3), two lock washers (2), and screws (1) over contactor terminals A2, B2, and C2. 5-20







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.