Figure 4-27. Rear Leveling-Support  Jack Repair; 1 Ton Trailer.
Section VII.  ADMINISTRATIVE STORAGE - TM-9-6115-660-13P_148

TM-9-6115-660-13P Power Plant Diesel Engine Driven 1-Ton Trailer Mounted (With Racks) 3Kw 60 Hz AN/MJQ-42 Manual
Page Navigation
  115    116    117    118    119  120  121    122    123    124    125  
TM 9-6115-660-13&P INSTALLATION 1. Install ground terminal (3), flat washer (6), lock washer (5), and nut (4).  Tighten nut (4). 2. Install ground wire (2) in slot of ground terminal (3) and tighten nut (1). Figure 4-28.  PU-798A and PU-799A Ground Stud Replacement. 4-56  Change 2