Figure 4-25. AN/MJQ-37 and AN/MJQ-38 Fender Replacement.

TM-9-6115-660-13P Power Plant Diesel Engine Driven 1-Ton Trailer Mounted (With Racks) 3Kw 60 Hz AN/MJQ-42 Manual
Page Navigation
  109    110    111    112    113  114  115    116    117    118    119  
TM   9-6115-660-13&P 4-25 AN/MJQ-37 AND AN/MJQ-38 FENDER MAINTENANCE. This  task  covers:  a.  Removal c.  Installation b.   Repair INITIAL  SETUP Tools Equipment  Conditions Tool  Kit,  General  Mechanic’s Reference (item 1, appendix B) Drill,  1/4-inch (item 2, appendix B) Materials/Parts Nuts,  Self-locking Trailer  handbrakes  set,  front  support leg/landing  leg  lowered,  and  rear leveling-support  jack  lowered;  paragraph 2-3.2.1. Switch box removed (only if roadside fender is being replaced); paragraph 4-13. Personnel   Required Two REMOVAL 1. Remove wing nut (9, figure 4-25), two flat washers (10), nut (11), flat washer (12), ground and flat washer (14). NOTE If fender is being replaced, fire extinguisher bracket and/or ground stud and data  plate  must  be  removed  and  retained  for  installation  on  new  fender.  If cable (13), replacing  roadside  fender,  perform  steps  2,  3,  4,  5,  and  6.  If  replacing  curbside fender, perform steps 3, 5, and 6. 2. Remove two nuts (15), lock washers (16), internal tooth lock washers (17), and ground stud (19). 3.  Remove  fire  extinguisher  bracket  (paragraph  4-20). 4.  Remove  data  plate  (paragraph  4-22). 5. Remove four self-locking nuts (1), eight flat washers (2), and four cap screws (3). 6. Remove five self-locking nuts (4), ten flat washers (5), five cap screws (6), and fender (7). 4-49







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.