• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
4-16  TOGGLE  SWITCH  MAINTENANCE. - TM-9-6115-660-13P_124
4-17  SWITCH  BOX  LOAD  TERMINAL  MAINTENANCE

TM-9-6115-660-13P Power Plant Diesel Engine Driven 1-Ton Trailer Mounted (With Racks) 3Kw 60 Hz AN/MJQ-42 Manual
Page Navigation
  93    94    95    96    97  98  99    100    101    102    103  
TM   9-6115-660-13&P Figure  4-16.  Toggle  Switch. NOTE Make sure terminals 3 and 6 of switch S10 and 1 and 4 of switches S1 and S2 are toward the bottom as viewed with switch box open. 3. Insert switch body (6)  into mounting hole and position hex nut  (5) against mounting plate (4). 4. Install locking ring (3) into keyway of switch until alignment tip goes into mounting plate (4). 5. Install lock washer (2) against locking ring (3). 6. Install hex nut (1) and tighten making sure that locking ring (3) alignment is engaged in mounting plate  (4). NOTE When installing new switch, conductor bus from old switch must be installed on new switch. 7. Remove and retain terminal screws (9) and  washers (8) from terminals of new switch. 8. Install wires, conductor bus (7), washers (8), and  terminal  screws  (9). 4-33







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.