• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section IV. LOAD BANK - TM-9-6115-464-34_439
Figure 5-14. Load Bank Control Box Assembly, Exploded View

TM-9-6115-464-34 Generator Set Diesel Engine Driven Tactical Skid Mtd 15 Kw 3 Phase 4 Wire 120/208 and 240/416 Volts Manual
Page Navigation
  413    414    415    416    417  418  419    420    421    422    423  
ARMY TM 9-6115-464-34 AIR FORCE TO 35C2-3-445-2 NAVY  NAVFAC  P-8-624-34 (4) (5) (6) (7) (8) (9) (10) Inspect mode selector switch for cracks, corrosion and other damage. Check switch continuity using an  ohmmeter. Inspect transformer for cracks, corrosion and burns or other evidence of shorting. Using an ohmmeter, check transformer coils for continuity. Refer to the Operator and Unit Maintenance Manual for wiring harness cleaning, inspection, and repair  procedures. If the wiring harnesses have sustained damage and require repair or rebuild, refer to figures 5-15, 5-16 or 5-17 as required, for layout, identification of material requirements and Appendix A reference for detailed soldering and replacement procedures. Inspect back plate and chassis for cracks, corrosion, warping and other damage. Check all hardware for crossed, stripped, and otherwise damaged threads. Replace all defective parts and parts damaged beyond repair. d.   Assembly. (1) Install chassis (22, figure 5-14), transformer (21), screw & captive washer (20), and nut (19). (2) Install nut (18), mode selector switch (17), tooth Iockwasher (16) and nut (15). (3)  Install  load  sensing  module  (14),  and  screw  &captive  washer  (13). (4)  Install  protective  cap  (11). (5) Install screw & captive washer (10) and nut (9). (6)   Install   protective   (8). (7) Position branched wiring harness (12) to install screw & captive washer assembly (7) and nut (6). (8) Install branced wiring harness (5), screw & captive washer assembly (4), and nut (3). (9) Install backup plate (2), screw and captive washer (1). e. Installation.  Refer to the Operator and Unit Maintenance Manual for load bank control box assembly installation procedures. 5-37







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.